Live tapping with Evides, Siers and Aliaxis at Europoort in Rotterdam:

Installation of a d250 PE outlet on a d710 main, 5 bar operating pressure. Done safe and quickly, no stop of supply. By the way: Jointing operated and documented with FRIAMAT App.

EN
Aliaxis Deutschland

+49 621 486-0

info.de@aliaxis.com

x